My DA42NG is in the shop for some maintenance, and the shop was quoted a 4-6 week lead time for the following parts. Do people know how realistic that lead time is (either pessimistic or optimistic?)
- Turbocharger
- Cylinder Head
- Injectors
Lead time for parts
Moderators: Rick, Lance Murray
- michael.g.miller
- 4 Diamonds Member
- Posts: 249
- Joined: Mon Aug 24, 2015 12:52 am
- First Name: Mike
- Aircraft Type: OTHER
- Airports:
- Has thanked: 11 times
- Been thanked: 122 times
- thommy152
- 3 Diamonds Member
- Posts: 73
- Joined: Sun Feb 20, 2022 12:22 am
- First Name: Thomas
- Aircraft Type: DA62
- Aircraft Registration: N271CF
- Airports: 16J
- Has thanked: 71 times
- Been thanked: 41 times
Re: Lead time for parts
I was quoted 6 weeks for an aux fuel transfer pump. That was about 6 weeks ago and hoping it will be in soon. Took about 6 weeks for a replacement trim switch to come in, and about the same time for a replacement GPS antenna. Seems like everything takes about 6 weeks
2000 C182S (N882SP) / 2023 DA-62 (N271CF).
Commercial ASEL, AMEL, CFI.
Commercial ASEL, AMEL, CFI.
- michael.g.miller
- 4 Diamonds Member
- Posts: 249
- Joined: Mon Aug 24, 2015 12:52 am
- First Name: Mike
- Aircraft Type: OTHER
- Airports:
- Has thanked: 11 times
- Been thanked: 122 times
Re: Lead time for parts
Darn that's a long time! I was hoping 4-6 weeks was the pessimistic end for routine parts.. but I guess I should set my expectations for 6 weeks now. I'll report back on how long the parts take.